๐ง Spec 5 Setup & Integration
Overview
This article walks you through setting up Spec Version 5 integration with e-manage|ONE. Proper configuration ensures seamless importing of SIF files and synchronized workflows between Spec and your e-manage|ONE environment.
๐ Prerequisites
Spec Version 5 must be installed on the same machine where e-manage|ONE is installed.
Project Notify must also be installed to enable proper file path routing.
โ๏ธ Configuration Steps
In e-manage|ONE, navigate to:
Tools โ Configure User Settings โ Personal Settings tabIn the Spec Integration section:
Set the Version to โVersion 5โ
Confirm that the Project Matrix File Path auto-populates
In the SIF Import to Use dropdown, select โSIF Import! .sif Fileโ
Note: If the Project Matrix Path does not auto-populate, double-check that both Project Notify and Spec 5 are installed.
โ Next Steps
Once setup is complete, youโll be able to import from Spec directly into your Bill of Materials in e-manage|ONE.
For instructions on how to use this integration in practice, see our article:ย โก๏ธ Using the Spec Integration Tool in e-manage|ONE
ย
ย