Overview

This article walks you through setting up Spec Version 5 integration with e-manage|ONE. Proper configuration ensures seamless importing of SIF files and synchronized workflows between Spec and your e-manage|ONE environment.


πŸ”— Prerequisites

  • Spec Version 5 must be installed on the same machine where e-manage|ONE is installed.

  • Project Notify must also be installed to enable proper file path routing.


βš™οΈ Configuration Steps

  1. In e-manage|ONE, navigate to:
    Tools β†’ Configure User Settings β†’ Personal Settings tab

  2. In the Spec Integration section:

    • Set the Version to β€œVersion 5”

    • Confirm that the Project Matrix File Path auto-populates

    • In the SIF Import to Use dropdown, select β€œSIF Import! .sif File”

Note: If the Project Matrix Path does not auto-populate, double-check that both Project Notify and Spec 5 are installed.

βœ… Next Steps

Once setup is complete, you’ll be able to import from Spec directly into your Bill of Materials in e-manage|ONE.

For instructions on how to use this integration in practice, see our article: ➑️ Using the Spec Integration Tool in e-manage|ONE