Haworth Walls
Ensure MFG Codes are setup to “Hide Opts”
Import as XML into e-manage
When processing PO - walls DO NOT have to be separated off as long as the “Hide Opts” is marked on the Wall line items
You can manually mark “Hide Opts” on wall items in BOM if necessary
PNL_LBL Must be filled out in CET prior to importing into EM
Hide Options on Quote Must be checked on the MFG Code (Tools → Configure → Vendor MFG Codes)